OCR Text |
Show AGREEMENT MADE x 1 TO REBUILD BRIDGE AANDY.'Ort. 19. Complete reconstruction recon-struction of the bridge across the East Jordan canal at Second Uouth etreet will begin In the near future aa tha result re-sult of an agreement reached at the laat meeting of the city council following follow-ing announcement of a Joint agreement having been reached with Bait Lake t'lty. Bait' Lake City will build the abutments to he bridge and dandy city will fill In the approachea and lay the flooring. Bait Lake City contemplate enlargement enlarge-ment of the canal before next summer In order that It will carry 150 second feet of water. Reconstruction of practically prac-tically all bridges will have to be made at that time and hence the work la being done now on the Second Bouth atreet bridge, badly In need of repalra at thla time. The work will probably not be undertaken before the canal la drained for the winter. It will then be hastened to completion before aever weather seta In. |