| Show RUSHING BUSHING TETON BRANCH Work on the Teton branch of ot the Oregon Ore- Ore son iron Short Line from Ashton AsMon to to Driggs a distance latance of or about abut forty five miles mUes is be beIng being be- be ing pushed with all possible sp peed ed The work on all of at the tho large bridges is I. practically practically completed and arid twenty miles of ot track l la is laid Several large Urge forces force of or men are arc engaged in grading and It la is exp expected ted that t the new line lino will vili b bready be ready to turn o over f to the operating de department de de- early in tho the fall |