Show COMPARTMENT COMP FlYE-COMP SHAFT SHIT S AfT OF GIROUX HAS BEEN FINISHED Word from EI Ely I Is 15 to the effect that the t e five compartment nt shaft shat of or tho Consolidated Mining company was Ws com com- yesterday As a ar d to tho the treat r t d del dal 11 of or tho stock of ot this compI company J in Knit lt Like Lake City Cf this tills with delight announcement will bo be b hailed balled wih Amon local I interests Interest wi ns 5 It Il means that th-it this company In itt that of tho tho great will I be in readings to heln he- he I opper c-opper camp 0 wi the thc gin ln outputting ju just jUit it U us quickly as s hol plant In Is If up has hRS a largo tonn of A 1 the company I tho the high grade copper j rc ro blocked out ont In portion ot or tho territory that tha t is accessible to I th h new shaft It I Is I understood under under- stood tood that shipments will ivill wt br be made mad to the tho International nt molting plant In Pine canon canyon can can- yon on for n a time or 01 until the th management t JIRS inc furnace o of or its Is own completed near the tho In commenting mm upon hl Ills lih property ork ii-ork tho the following Interesting t account Is gi given gin n by br the lie EI Ely Hor This Thin which wilt will be one on o of th the hlf largest and most roost perfect In the entire entre district t. t wa irac wat s commenced at a A point pint CO OO feet feat west esl of the old Alpha ShA shaft RloU n f. f carl early of or in tho the July Jul economical of or this year ear manner in the work could coull he be done t the entire entre the plan shaft was S conducted on nn through th the tha s use being carried out Alpha Alph shaft workings shaf the thc last fe few weeks the miners rs havo been averaging six Ix feet or 01 moro moru mort YI ben calculated each cacti lay day and amI the management m ta would h he com corn that th the olk ed r closely 1 T-nin T t 1 1 1310 1010 1 later than January Jl not i i i v 11 s1 v t tb the i lc men with lh ui a little ti adde added th the flat date bv 1 1 the will ill Jrr bo ho beaten b by two d days s and anil 1903 sees ees wi tl 1 b completion of the great hole hoe ho Ready Bendy to Install Intal Machinery Machiner the completion comple om for tor In advance preparation lp d Anc ton al- al I. I tion mu of the work tho has be been n constructed and th the machinery machin mathin for hoisting the r ery 1 ry has been Installed rock from the 1000 00 le level lel l and the lower r rIc Ic levels I as the hole holo Is I driven n still sUl further toward the tho areat reat ore bodies lying between be be- lowar level Ic I IThe ecu tween th th 1000 level and ad the Ic e The hol hoist t is already In tn place and thet the t ri will I he be Jt started ted on sinking operations operations opera opera- immediately tons It is planned to sink sini- to the 1200 I when the will be installed le level lel l. l pumps wI b will be of the plunger r pattern and Tb h will wi so se have 1 a a heo capacity of oC 1200 gallons of minute lifting that hat great volume Rl water r a a 1200 f feet et to the surface A larce Jarl arge station staton will ihL 1 be he cut at at the 1200 l OO station working and fr r fO a pumping f and nd as soen n as this is completed the lie shaft 31 will ui bo be bl r by the pumps shaf wi The Tha company will then lien be lie In a a. I position n tn produce prodie at a. a 1 minutes minute's notice great tonnages of excellent copper ore ores running run rim In tho red d dJ 1 ning IJ from to 15 per pel cent r J metal tal Rich Ore Already Developed The company compan pi lor to the dl disaster h caused thin tho closing cosing of of the Alpha body of or e epe epe- pe- pe shaft developed eloped a great bd Hally rich copper opper ore much Ilch of which was ii tal Impregnated with quantities of the finest native copper and the general 8 average lat nto nto exceptional percentages The Tho general average o of the tho lie or nie re rn Ariz being di direct dl di- n tim tho Arl ores r ret t and tr free from nm rom refractory elements nt In September 1308 1908 the th company com corn trial shipment nt o ot of tons pany shipped a n ton tonto Salt Iak Lako City to tt tho Garfield Gi smelter at Sl Cl which cral a averaged r between 1 12 arid and 13 per percent percent cent copper and which gave Ja c a n net t return of or 44 Lay Steel in the Spring Announcement l wax wa 8 made h by hy Superintendent Mills Mij of oC this the this afternoon that the grading for fOl the company's ox ax- s connecting each of nf the Uie various parts of or th tile the property for tor fora a standard gauge rail load has been completed com corn d. hut that steel t l will i Ml not be b laid J ld I until spring 1 because of or the thc depth o of snow show IO l the grade rs t Tie lie said aid that lh there rc will hl b no Immediate use for the Ike Ih track wf from the thc 1009 f feet l that h lies has already already- ad been Paid laid and Ril put Into Inlo commission until la 1 SH put would give hc spring and that the th snow oll considerable bl trouble to tho the U gF This his added trouble and expense will ivilL not be he necessary nf IAry and 11 for rOL this reason i leson corning th of or spring will nil 1 be awaited d be bo- forc fore the tracks arc tC l laid lc |