Show YERINGTON MINES TO HAVE E SMELTER Thy Til series cres of or examinations now no h ing made mado un under r the tho p personal r nal direction of T J. V metallurgist t of or th the Y Yerington anti and nfl Mason Valley mineral feld fields ir is 18 of ot great ut Interest to lo a n number of or local people peo pro pie pic who S o have pinned their faith to that section of ot Nevada In fact tho the rehabilitation tation of or that wonderful district ha has b been cn My In the tho hands handA of Salt Sal Lakers MaKOn Ma- Ma In- In ton KOn Valley Valcy Nevada Douglas Dougl and ami other big mineral I e estate in that section arc are controlled con Coil trolled by hr mining men mn of this state and now tho the Copper Belt railroad H Is If heIns the th r I constructed d under tinder personal p Monal supervision 8 sion IoU of ot W C. C Or Orem m of or this tins el city Tho The prima object of or tho the examination now being conducted by hJ Mr Ir is 19 for th the purpose of of deciding upon the tho smelter r construction a R portion of Is i under way a Low Lew Humphries Ios consulting consul consul- consult tag Ins en engineer r of tho tire Mason Valley has Just lust returned from tho the camp whither ho hohas hohas has render what n assistance mn may maybe mayb b be r required In the research being COndu con con- du ducted ted In tolling of or th the tho present renditions rendi condi- tiona In th the Nevada Navada Douglas and Mason ason Valley mines tho the eam camp paper tho ho Mason Iason eating esting Valley account News gives the tile following Interesting Inter Inter- As to the tho Mason Valley mine with t wih the tIre Information that the upraises at N No Na 3 and No 10 4 levels de designed for or ventilation are aro about Abut to bo be completed comes omes the arf verified statement tBt ment that in each ach of ot these air air- all sh shafts shaft r which from top to bottom a distance of or nearly three hundred feet pierce the tho heart of tho tire ore reserves 6 11 have been continually in itt ore oro of or far better heter than thal an average crage grade Jrade In Tn fact tact the tho upraise from roni No 4 o level h has s recorded an average of or better than from 6 to 8 per cent cop con per ncr The true tro significance of or these theo facts viii wi not he be lost on any an person p rn familiar with the developed d ore re reserves eres of or Mason Mason Ma Ma- iason ia- ia son while the tho existence of or the continuous ore or bod body from level lp el to level has heretofore been amply demonstrated th the disclosures of or th these sl upraises make a further demonstration d ra ton that tho the values aro are also aIM continuous throughout with oc occasional oc enrichments that put the ultra ultraConservative ultraconservative con conservative in a state of ot temporary em cm t. t Over Oer at the Nevada evaa Douglas developments develop develop- developments ments are aro nr the tho arrival of or tire tho Copper Bit The foot root shaft shan incline which taps th the sulphide oro ore bodies Is en en- en entirely completed and nt cit present work ork Is with the confined to equipping the same ih necessary machinery to operate on a production production pro pro- ducton basis bais From all Indications it seems seem to bethe be betho a i tho the purpose of f tire the Nevada Douglas Douglas Xo management man man- to arrange arango for th tIre the handling of tho gypsum deposits at the J Ludwig property property prop prop- Crt erty during tho the period that must intervene inter Inter- vene venc the tho arrival of or the Copper COPer Belt there Owing to the tho nature of the construction work to be encountered in the canyon it will tm likely h be the 1st 11 of or June Jun before the tho thomine mine Ikel is reached and this will 1 allow alow six months month for that pur purpose se It I is stated that Manager W. W C C. Orem is offered a a. a contract to d deliver dOliver lher three hundred tons ton of gypsum daI daily the same whenever he is read ready to undertake |