Show BUILDING CLAIH TURNED DOWN DOWNS S board bowd of public works finally rethe retie reS re- re tie the be claim of the thai Campbell Build Build- Company S for work d done nc on on the stave outlet pipe The claim i is The claim was rejected ti ground round that the contractor did LIld amply with the specifications The until upheld the board board beard signed a 3 contract with the flue Elevator company for an elevator fre e dt city sido side Q of f th the cit city and county lift The bid was The TheEmon TheEmon TheEmon Emon company put in a bid for forThe forThe The Tho elevator is 15 to bo be in work work- er by r the first of the year |