Show BOSTON CON Mill TO BE B El ENLARGED Since tlc the recent visit of ot prominent orrl- orrl u of ur the thc Dos Boston ton Con Consolidated MInIn mine at ot and UK tho Company compan to 10 It Is generally un under under- cr- cr mill 1111 at J 1 that there thero Is IM If considerable erble Import Importance Inspection H It ance attached to tho the 1 wl b be that at the time limo ot of the thc reduction plant at ai construction of oC the tilO Ga was opposition tion to 10 tho the t ml POC process lo for nm Bottles In Ing ton ti the that tho deposits t nis experiment Metallurgist had pro proven the wisdom of oC hl hits his choke choice nd cind It was ws decided to Install an on plant at ot thu Property In tu this In ii jIve ive were placed and JI C after vcr very cry successful trials even enn Iho those thoc nt e who opposed thu tho tamps stamps made to i see l that there uler was waa a close co c Ravin tH t made mad by hy the new process but hul It I was wat u tu to only onh build half of QC tim tho plant as orl l- l 11 bult d. d lor for C fear car nr that possible wie had hati rt mad v len u the unit at atthe After fter tl the ho uni the We Garfield plant plant It I was shown that tho thc thomine mine producing a J low Jiw w grade of or por- por was 1 pr- pr would depth 3 ore or M and that u it Gr at r tho Im- Im to 10 bo ho attained to Get pet under tinder summit of oC the tha overburden on the summit mountain O The rue tt am sho and numerous tunnels abandoned Into th the great 1 t tell ell veins This develop development de ment resulted rosult d in lii tho lh extraction of or a better bet It ter tr grade erode l Id Ile of r or ore and I Its delivery cr to mill 11 boon lon I showed that thit thal a 1 very O. O hl hIgh h grade concentrate concentrate con con- cn was sva wa produced The rime capacity of or limo tho mill mi wax wa wal ln vas l at ot atthe work oik mat Just a R fast CaRt nOM nn the tho development C 1 th the Ii mine A proceeded until the nil fud Ili capacity capac v a required to ity of or limo tho present plant n Iy pr output Advanced d do- do handle the ho Tally dally Inneo work ork has since mInco shown hown tr-o tr te abil ability than ban banI to more Inure the tIme ity of I I at athis atI twice I the tIme that h Is 11 mine initial 1110 1 I his time an and now non the lit directors aio nyu 10 being In order oner double the thic mill plant to tu url tlC mi be that Ut a n greater t earning power la may lilay Ir the shown All n ln r nl o that howl greater the time Al amount of this thia lo low loa grade ore 11 th the lower wIlt will wl be tho the r cost ett t tot of ot production Thus with wih a ton re reduction tc- tc feels c th ment n plant reduced to to-g to Sent S loin laIn that tim tho cost ct would b be ent a n pound and n. n lower Il With nth tho ho return of Ip offices or of eastern to Lo the and JennIngs s casteIl mt ton Con Consolidated oUra teel It I 1 l believed th tint that t lh matter of oC time tho of cf the the mill will tl be 10 Immediately immedIate IH taken lAken under advise advIse- U lse wi ment m Within a si few fl weeks President lt cast and anti Samuel New house c will be In the ct nt nl that hat tIme lime the time proposition wl nUl nay may he be voted upon Sh Should uld It be lc decided to 10 add it to the Inc themi mill rapacity apal tho ho work can cn bo Ia carried on throughout mi hout the tho winter months without interruption an any of ot the The Thc cost of or time tho second portion porton only onh bo be about half what mill plant will m tho ho portion porton 1 cost All Al time the thi liar halt L ben been n built hum a portion of or tho the present be used the same samo power Is con can on oaRed Increased size sizo Izo proposed sufficient for the tho Is Imi the equipment portion of and a a. R on ol-on already In installed t |