Show RAPID PROGRESS ON PAVING OF oi SIDEWALK The pa in paving of Exchange place b be between between tween the two tk rapi-r rapi was begun this morning by a large larg force of workmen The work is Lein being put through h with wih the characteristic energy which has marked all al of the work on the thc build build- ings inI Bj- Bj noon the street had been leveled lev lo elc ofT off 00 aud and the concrete foundation laid a distance of about twenty feet fet Tho The rest of it will wi bo ho put down this afternoon afternoon af Df af- af and tomorrow the surfacing of asphalt will wi be applied It I is expected ex tx tb that t the work will wi be bo complete h by noon tomorrow tomorroW which will wi be bc a I record for paving pa in this ci city |