Show MAYOR STARTS BIG SEWERAGE SYSTEM Mayor John S. S Bransford thre threw the electric wItch switch that started tho the pumps at atthe atthe attire the tire pumping station for fOI tho the n new w west westside I side lIdo sewer station Saturday afternoon i and antI n na a. a a. rf result ull th the m started oft beautifully at lt least that It Is the claim of th the ell city councilmen and members rs of the board of public works who watched the operation Now ow that the pumping station has liars been hacen put Into Inlo o operation and the water being tali taken on from the Intercepting pe sewer er the work nork of 0 connecting tho tue laterals to that pipe may be bo begun bigun soon To remove remo the water from rein tho the Intercepting sewer several sev ses' cral c eral ral mites miles of ot Jo low and exceedingly wet ct country will Nill have 8 to be drained This done the bulkheads may bo be removed d with OA ease vo O and the tho Immense sewerage system salem put Into commission |