Show s OF V M MINE INE IS RUSHING 1 WORK i- i t UNDERGROUND U t igN benK out for tor exten- exten itt At the mine 1 tM there tl I. every every- win will take tAko thIs property to the porphyry ot or this country It I p work bas ha been on I by a most competent crew and aDd the concluded In ample to bo be latest devices S' S In I concentrating plant arrival from that or the tate late tens tells local local- that the lull development arni on a. a large pwe as alii to the Inspiration Cop Cop- rh Ife companY mIne at ot becom becom- ODe on of the great In the h bialt t are In pro re ahead at an In In- heinZ being k t II 11 rapid TP rate A. A connection is 1 between th the MaIn East EMt level and connection rt I. I CD tb be made with the Main West WestI Id the same levela tow days later It I on haulage drift is II being opened up tw at att the th lI level on a t feet f St of the present north north- drift is In the Colorado ore h ft r rk ilc IS II In progress on the to order Bush ore body In be fI Joe os and openings manway adequate 1 ide e which will be that ore body hodY e of he fourth the two long lon rallies raises front from re 0 ITS are dump TheM I UP to the Bush ore approximatelY 30 feet and willbe will be holed hold through to the ur cc I Tats raises will be put up from these i the whole stock pile surface ma may drawn rawn tat hat oft off and ont to th roll mm with geological no shoveling or of the In- In has just been beena MiamI mInes TI an Locke and J. J M. M t R. Rate Ie a by Augustus extensive i to a more preparatory Investigating of Iy y for the thA purpose enrichment ThIs work under the tho direction ot of I carried on in nJ who Macs faes Graton of CambrIdge e. e Co tho of ofer tn In various parth of the tho depositS per er with the Is 18 obYne try ne Ile ru minIm companies whose hose proper proper- are STe affected employees hare ha Inspiration 11 the tho In I beth beeh put Jut tOI ork for the tho American steel nt the theof theof Is 15 unloadIng e campan of the maIn shafts Bhatt for the double The foundations are cOrn cOrn- c mt m- m 1 frame III Ia boing distributed for tor t d and steel teel taw few lon And within a at the work ork will be tn in progress of the head fr frame me Itself t the nie smelter site lite grading Is in pro pro- ID bos McArthur Bros Brol company rite re of If the work ork The pur have been n from the main lIne to the smelter The steam shovel sho Is Ie now dl nc a side Bide track and the W Jon road will to the other r side aide of the tho site I hu has been een cut ort from the former t |