Show COLD WEATHER ALTS 1 WORK ON NEW BLOCK i Work orl ot of pouring e tot for the nr t I Ilie lie ot at steel Elt at th the churchs church's new general office buIlding EaSt EaRl South Temple street b between the o and the De' De ret gymnasium will be re- re lImed as ns as the moll mod crates YounG Sons the architects In charge announced this morning that there was wall no rush work to be done Beams and pillars or guiding the conCrete con con- cr Crete te into Inlo the molds and the tho apparatus the concrete Js is carried to a height or of about lilly feet teet and titer then Is poured Into IntI tho molds without touched b by hand are arc all In anti read ready or use All work worl on the building has halted durinG th the present cold collI weather er |