Show RUSH DOUBLE TRACKING POCATELLO Ida Oct 17 E. n.-E. E. E C C. C Mn ln anion on n assistant general manager of oC tho thoI I Oregon Short Line Lino 1 III In town on a tour of ln inspection He 38 that the double double- tracking will be bo completed between Foa Fossil o o lI lIend f end nd Diamond a stretch of ten miles mUes within the next thirty days das The tracking track track- ing west of or- or Pocatello to MIchaud ton ten miles will be finished by tho the same ame time The tracking double-tracking between McCammon And Lava Lavas IS s almost completed and the material Is on hand for or double track work Worle between Dingle and Mr Ir Maison Man Man- eon son says JaYs that there thore is practically no con con- coni i in moving the heavy he crops and that there arc are plenty of or cars |