Show CON IS MAKING PROGRESS DEVELOPMENT J t j. j val from Mum MIami US th that Lt te durinG the thema ma an ance ad ot of feet tut R tr s. s Ot Of the s In large rge drUb 78 In 1 JI drifts ant and 1332 feet In ral UV raIe were tn In th the IU lIre only two to being onto orbo fo for the Jo Du Bush b t e Jo t for ore oren ore ora dumps r. r the from n One of those two rises raIBe through into the stock 1 was mado mada with th maIn on on nfl th the Wn and n ft the ime iame QI le wih with the thc main On o. o be soon ft b shaft th the n the tho to If fh Ij t feet or of being e the way a 20 It I Ia It beIng being widened I ened to and other work Is 15 being th tM main west cst Wr haL n At t the tho Scorpion plan operation cru the ln In S f. f l part or of the The V lm waste ute tha Is If being used to fill fU de- de h site for the concen- concen th the 1 n UI still tn n progress at It tl purA neto concentrator walls of the wais than two thirds a more nl Is hen installed rap rap- tu test mill tho ton flotation mi h machinery kIf and erected nd all al the crushing 1 for the crushing crushinG plant double shafts maln st and vet en hat has arrived and ni bl been n. n Unde un- un 1 considerable work ork has be been n de ud of the t to the erection te fr frameWork work For the last week tae teet re bup cutting away have been busy renter of ha e f the south fouth side Bide of the tha main a head wet t there f and and the the wooden American noW frame Irm track tn In a few wm will lay 13 A Bride e com companY locomotive to s 's o the of the crane head frame frame rec- rec sp r run directly over o cr tor w or of the main west t hf Three No 5 f arrived and are being un Un- have w ari The coarse Webster gulch In ode or of four crush crush- will pl crusher Vil having Ing beon received re- re tIme ago o. o it U is being tu used ed some som I shaft About the Scorpion At t J the ne will wi be turning t mill out ou for tor the he t 6 ton a la day mi |