Show Big Production Expected In Bulion Bullion No 2 Well Wel Strong gas fumes which came In at a depth ot of feet in the No 2 wel well being dried drilled In the Coalinga California field feld by the Bullion Bulon MIr 11 Ing company lead directors of the company to beleve believe that a a mud larger production may be expected from this well wel than was had In No 1 which came in with wih barrel barrel bar bar- rel production ninety days ago Ten Ten- inch casing is being installed in the present hole which was drilled owIng ow- ow log Ing to an accident in the original No 2 well wel The casing is down feet and It will wi be taken to the bott bottom bot- bot t tom of tIle the hole A report ot of oper- oper a was given to directors of af the c company at their regular monthly meeting Thursday night by M. M A. A Pritchard Prichard who is in charge of tile the drilling work |