Show i en t to 0 Boost OOSt Copper o er Output ut ut At t Garfield ar i e Plant ant Utah Copper Division Ken Ken- Copper Corp will increase in increase increase in- in crease production of copper at al its Garfield electrolytic refinery from to tons per month by end of this year The announcement was contained contained con con- in m annual report of oC the company which disclosed the firm made net profits of equal to per share last year This compares with profits o of equal to per share during 1950 Gross revenues of the company jumped from in 1950 to in 1951 an 1951 an increase increase in increase in- in crease which was greatly offset by higher taxes and operating costs Charles R. R Cox firm president reported that production increased increased in increased in- in creased from Ibs lbs in 1950 to io lbs Ibs last year |