| Show 111IA411111 111ANSO assay DOCK Navy Deptirl at 11 I or 10 trI it tr-I 11 a Washington June u The navy d Ie bIt pnrlm n al today udurllMd I for bldi I fir Fr crte ton if thi dry dock at the Iaau uliiid navy yard which 11 sulnorit1 by lh tat of May 4 im Taw BTIT nratloni fdr also dm k are v ry sludlar to I those of tin Marc Inland dock for which bill were opened two istaks ago The dry duck la lo Los of m timber the entire structure to lx founded o pile unleei during lh progreM of the work It la found better lo sultllule concrete fO piling T forewarns dimensions of the dock an la b ai follow a length on ti Ing from head to outer Blell M feet length nn floor IlTl dlh on coping In bt ly 1 III width o notir M width on coping at abutment 7 = k lot width al emrnnce on mean hlth I water level 101 depth from coping lo men high water M depth from cop Inl to I water floor 40 30 draft over sill at mean SRm1lATumps f Ihr In number ar 10 lie I at the 11 o t ZIrtngCPIoilllhime 4nM natifin to rlna IUn veica om found engines lh I o dl ftnmaimwggw racily cnnIl 10 patch Rocklatine T am to Joe I eight Heel Iwllem Tb Ia on li lo INI 1 Ihiallmtfiteoflpoai form conelructed of pteet Then are to IK electric power capune and winches The bids mint covers oerrtnlni to nn tar the dock complrle anti In efNcMnt working order The advertisement I I prnllr I Ihnt the dink must be completed com-pleted within thirty calendar month after the letting of She contract |