Show Ogden Reservoir Receives 8 Bids Eight bids on the construction of an equalizing reservoir to meet peak Irrigation demands on the Ogden distribution system have I been received by the bureau of I reclamation E. E 0 O. O Larsen regional reg-ional director said Friday the three low bids were submitted by the Wheelwright Wheelwright Wheel Wheel- wright Construction Co 63 63 Kingston King and Maw Ataw contractors contractors con con- tractors and the L. L T T. Johnson Construction Co 72 2 5 All AllI three firms are in The contract will be awarded after approval al of bureau engineers eng in Denver Mr Larsen said He noted the high bid for the work was |