Show I Od n u Salt Lake Construction Attains 43 1 Total in August Although Salt Sal Lake City building building build build- fell below the ing construction fel te preceding month and the corresponding corresponding corresponding corre corre- month of 1940 August construction totaled and brought the he total for 1941 to 4 Construction for the eight eight- month 0 I period ending August Augst 30 was more than tan in the corresponding period of 1940 Augusts August's Augst's total Included for residences Of that amount was vas for new residences and for alterations and repairs reported William J. J Goodwin Goodwin Goodwins Good Good- win wins chief building inspector S. S l |