Show MANY REPAIRS IN I OGDEN'S SCHOOLS I 1 OGDEN Au Aug 12 The The closed period of tho the Ogden public schools has been f. f utilized d by the tho board of education and the time limo has been put in with working work work- a in ing ingmen men on man many needed rc repairs pairs on some some- of tho jho buildings A number of chan changes es and improvements havo have been beon t made mado in the tho old high hith school building i t which will be bo turned turn into a grade as soon Boon as RB tho the new school is completed A new now front entrance stairway has hns been built and tho the building nJ generally im im- un- un I proved pro I If A sanitary system has been installed t t at tho the school which cost 2000 and in some of tho the other schools schools' chan changes es and improvements have been heen made that will provide for the tho comfort and nd safety of the tho pupils I |