Show I ONTARIO DRAINING Manager tana cr Ernest Erest B of tho the On On- tario tarlo Mining company compan said this mOlI g that tho the water In the Xo No 3 shaft shaf of or the Ontario mine had been heen drained about thirty feet below the foot 1200 level lovel Between Be Be- tween four and feet of or water Is being drained from froni thIs tills shaft shat each ach da day and tho the seven drill dri holes that have be been n sent Bont through the o obstruction In the long lone lonG drain channel are arc drawing oft off oc the tho water at a much faster rate than w was anticipated a tc few weeks ago The prospects are arc very er bright for tor the drawing oft ot of the thc waters In this property at al a n much earlier date than was wa first contemplated |