Show WORK PROGRESSING ON BIG ELECTRIC PLANT Where the Energy of Shoshone Falls Is to Be Disposed Disposed Dis Dis- posed of Not Definitely Known While It Is la not known to the public when the great greal electrical energy will Ill be disposed of ot th the project of or a vast electrical plant at t Shoshone Falls Ida Is well under wa way and a force of or men Is la now at nt work where the generating plant Is to tobe tobe tobe be installed Mr Campbell manager of ot the Utah Light and Power com company pan when seen today said that no contract had been given gl by his comp company n for the delivery of or oran an any power from Shoshone Falls Park ParI City BIngham and other mining camps have most probably contracted for a n. large portion of It A small portion It Is known will be transmitted to Tuscarora Seventy feet teet of or the foot O-foot incline which will convey con the thc water from above c the falls taIls have been completed and a a. force of or men arc Ire busH busily enraged engaged driving the face tace of or the tunnel In The Tha Shoshone Falls have c a perpendicular t fall ll of oC 12 feet and the power that thatIs Is running to waste wf Is more than sufficient to supply the whole State Slate The rhe turbines and dynamos of or this company will VIII It Id Js claimed be installed b by the time the tunnel under the falls rails has been completed ted and In the thc meantime the routes for the transmission wires will be surveyed sUr |