Show BASIN READY FOR TESTING Water Will Be Turned Into Into Into In In- to Saltair Experimental Pond at Once Manager Langford Lansford announced this morning morning- that the temPOrary temporary basin made at Saltair as an experiment to test the sch scheme me proposed b by the engineers en en- to reclaim Saltair aa as a 3 bathing j resort will be completed tonight and that water will be turned In at once The tank Is only fifty feet in diameter diameter diameter eter but the wall around It has been blen constructed with all the care possible and if Ir It holds the water as is the en engineers engineers en en- expect It will sill work will begin on the big bIS basin without dela delay The question to be determined Is 15 whether the soil Mil It formation In the lake will wilt retain the water To fortify against seepage an nn excavation four feet wide and about seven feet deep has b been en made and this filled with clay brought In from the coast Then on top of ot this the wall of rocks and antI clay has been built If the wan wall proves satisfactory sat sat- In the experiment one exactly ex ex- like It will be constructed around the pavilion The basin thus In d will be 2000 feet In diameter and willbe will willbe willbe be kept full Cull of water by means of oC a a. pumping plant |