Show I 1800 MEN AND TEAMS ON LEAMINGTON OFF CUI-OFF I Hydraulic Engineer Mark of the Oregon Short Line returned to town last night foot sore and wear weary after a trip along the Leamington cut cut- off He said that about seventy miles of ot the off cut is open and about 1800 men and teams were working working- on the construction When the work gets fully under way there will be men and 1200 teams at work They are doing some heavy cutting and filling ing In the vicinity of Sharps Sharp's summit and add at various points along the East Eat Title range for a distance of ot I twelve or fifteen miles south of Silver I City Junction said Mr Merta ugh A I gang is working wi with th a steam shovel between Garfield beach and McIntyre's ranch They are making a twelve-foot twelve fillin fill fillIn fillin in front of the old Garfield beach pavilion pavil pavil- ion ion- Another shovel Is working on the tunnel at the bar between Terminus and Stockton and yet another at the cut at Sharps Sharp's summit between the Rush and Tintic Tintie valleys Altogether abo about lt eighteen contract contractors contractors' rs' rs outfits are being kept busy |