Show MAKE MAIE TRAIL TO THUNDER Surveying Party Is Pushing Pushing Push Push- ing jug Through to the Gold Fields ELK CITY April Apri 2 Engineer Walter Wal Wal- Walter Walter ter I Hovey ovey Hill Hi and his party all al surveyors surveyors surveyors sur sur- sur- sur reached Chamberlin basin March and will wi push on to Thunder ThuD ThuD- der mountain as fast as possible Mr 11 Hill Hi is making a thorough survey survey survey sur- sur sur sur- vey of the trail trai as he goes and is on the lookout for all al feasible ways in which to shorten the distance The brothers also reached the basin on the same da day at which place they have established a a supply depot The trail trails trai Is s now wide open to the basin bain They have lave seventeen head of horses loaded with feed fed and miners' miners supplies i A force of carpenters is at work on the he ferry at Campbells Campbell's Campbel's crossing on Salmon river In the meantime the travel Is acc accommodated by small smal boats and skiffs Some builders bridge bridge are at work building bridges across Big and Monumental creeks cree They expect to have them ready for travel before the spring freshet melts mels the ice |