Show Youths Push Mirror Lake Route PLEASANT G GROVE R 0 V E Frank Hyde superintendent of construction construction construe construe- tion at C C C camp F 43 here has reported that some 75 boys are now in spike camps at Soapstone and Mirror lake with ono one of ot the prIncipal principal principal pal objects being the building of a standard foot 21 highway from Mirror lake over the divide onto the Provo Pro river watershed and along the river The crews have graded the new alignments and widened shoulders where the road will follow tho the old line They have progressed two miles from Mirror lake Jake and are now on the crest of the divide between the Duchesne and Great basin drain drain- ages In one stretch five eighths of a mile in length the boys eliminated eliminated eliminated seven sharp curves giving a perfectly straight roadway Superintendent Hyde said it will take the remainder of ot this year and anda a portion of next to finish the construction construction construction con con- part of ot the road after which he hopes the C C C will be beable beable able abw to place a crushed gravel surface surface surface sur sur- face on it |