Show PIPE PIPELiNE LINE CONSTRUCTION FINISHED AT SCOFIELD PRICE PRICE Construction Construction of a mile and anda andl a l h half pipe line linc-by linc by the people of Scofield Scofield field has been completed announced J. J T. T Mausby F FER E B R A engineer for Carbon county Thursday The pipe line line taps two he said and brings water to cofield co- co field for the first time since since dro drouth lh conditions dried up its water sources nine months ago Two-inch Two cast iron pipe was provided provided provided pro pro- vided through F FER E R A funds and the installation was was done by the peo CO COpIe pIe An expenditure of 1299 was was made said id Mr Ir |