Show Work For All Utah Unemployed Seen in Latest Relief Plan Salt Lake Projects as Revised Would Bring to City Engineer Sees Bright Hopes for Future Employment of virtually all of or Utah's employable jobless for a a. a year under the work relief program proposed by the president president president dent was seen as a possibility Friday by Edmund B. B Feldman public public pub pub- public lic works woks administration engineer examiner for the state Mr 1 Feldman who is in charge of ot oU office ce work incident to the statewide state statewide wide survey being made of public works projects which could be included in included in the presidents president's program lm pointed out that on a per capita basis I Utah's share of or the would be That would be enough to employ for or a year on the basis ot of f a minimum salar salary Mr Feldman Feld Feld- man said id There are cases case now ow on federal emergency relief administration administration ad ad- ministration roles and a a large part represents unemployable heads of ot families When the are re taken from the list it appears probable that the others can be absorbed absorbed ab ab- ab in the proposed work relief program Salt Lake City's share of the worth of projects listed for consideration under the program in Utah by those thore making the statewide survey would be between and imd nd it was indicated Friday Fri day by Mayor l Louis Marcus Figure Boosted The figure was boosted from 7 7 as engineers and arid department heads leads hurried to complete the questionnaire questionnaire ques- ques sent out by Mr Feldman with the warning that all projects in n the state must be recommended to o officials In Washington by March 1 1 The ini initial ial program outlined by city engineers called for works tot total total- ling l- l ing ng about This figure was revised by department heads and cut to a little more than However upon receipt of ot the government government gov gov- questionnaire a second second revision revision re- re vision was started in City Engineer William D. D Beers Beer's office The fact that public works costing have been Included In n the pro program am to date dale does not mean 1 that the city will ultimately ly undertake such an ambitious program pro gram it was pointed out by officials Projects Restored Practically all items including between be be- 1 tween een and for Argenta Argenita dam Big Cottonwood canyon canyon can can- yon which were eliminated in the initial revision have been restored r to the lineup of sted projects and ands s several veral have been add added d or enlarged Divided d Into gen general ral project headings headings head head- ings the list follows follows' Subways and underpasses Street improvements ments Road changes chang Bridges fc Buildings Repairs remodeling buildings buildings build build- ings Park improvements Sewerage surface drains and sanitary u. u Dams and reservoirs Water supply Miscellaneous Segregated by departments which will benefit from projects the report ort will show the following Street department Water department Park department Public affairs and finance Public Pubic safety The initial setup providing 1000 for a municipal auditorium was amended to provide for tor that purpose and for lor purchase purchase pur- pur chase of ot sites and buildings in connection con with creation of a civic cen cen- ter Details of ot the program were being checked late Friday by department heads before forwarding the report IY to Mr Feldman |