Show ASTERN ARCHITECT Will HELP SELECT SELECTS S HIGH SCHOOL PLANS Wil Will Also Pass on Nature of Foundation at Proposed Site Sie The city school board at l its is session last night received the report of Eli El A. A Folland Fol Fol- land hand superintendent of buildings and grounds of the city school system on the feasibility of constructing tho the new high highs s hool on the Bothwell site Mr Folland Foland in his Investigation of the suitability of the site sie for foj the construction construe construe- tion Uon of the foundations that will wi be necessary necessary sary sar to support the tho enormous weight of the structure made ten borings from seven seven seven sev sev- en and one-half one feet to twenty-one twenty feet apart on various parts of the tw site sie These showed showe that the soil is virtually the same at all al points The soil soi consists of from eighteen to twenty-four twenty inches of loam some sonic nine to ten inches of concrete gravel six Inches of clay and from seven feet to fourteen feet of sand containing a thin stratum of clay Water Vater was wa found at seven feet on the west west side of the site sito sio and at nine feet on the east side of the site The water ater on the west side rises el eighteen inches and on the tho east side two feet teet The board boar received the report and will wl consider It Jt at a meeting to be hold October October October Octo Octo- ber 21 21 An A eastern easter architectural expert will wi be brought here hero to Inspect the site and to give Ive a detailed an ana scientific re report report report re- re port on the soil soi formation that the board may hive hi e an unbiased report and to act as an adviser to the board in the matter mator of selection of plans |