Show SANTAQUIN KING HAS HASA A LARGE TONNAGE BLOCKED OUT i i I L L. A. A Martin ha has s received some t-omo late lale assays on the thc oio that Is no now appearing In tho th face Cace or ot of the tho tunnel that is la being extended cast cast alon along the fissure This shows shows' the tho presence of oC silver lead sl lc ore which will wil net net th tho company compan from 30 to 35 a R ton free reo of oC every charge charle and tho the management is now no engaged in blocking out Olt a large tonnage of oC ore oro or every cry pound of or which can lean be shipped at a a profit A rough rouSh estimate of oC this ore plates places the amount now in sight at at 10 tons A A. tun tunnel 1 was wras started stared in this Santaquin property on a a. small m l leAd led and after beIng driven 70 iO feet an ore ore bern bearing fissure was wa encountered was WIS sunk on this fissure to to a n depth of or thirty feet and the fissure which h shows four feet of ore oro In Inthe inthe the tho tunnel widened out to eight or nine foot feet Ceel The fhe tunnel wa won WL continued alon along the fissure to the east and has been driven in oro ore nil all aU the way for a n distance of or about feet teet In places this ore body by has widened out to fifteen feet At a point about abut 10 re feet t from where tho the fissure was wa tapped a n cave caves was s encountered and bel below w this cao a a Second cave cavo was wa found The Tho this cave Is sixty feet below the tho l level ev l and ant both caves cu c appear to tobe he be in the fissure and are aro mineralized on all aU sides A drift has been started from the thc bottom hot hot- tom torn of oC this second cave east on the 11 fissure ure anU anti the tho same samo Is IB found as W that above on tho the tunnel level Tho The top of or the cave was vas bridged over being about fourteen foot feet in width and the tunnel has been extended about forty five Corty feet reet on beyond the cave The Tho oro ore in the face fae ace the best Inthe Inthe In Inthe of this drift Is yet opened up the property and tho the ore ore bearing fissure fissures i Is s found to bo ho continuous A raise was RI also o sent fent up in this fissure twenty live feet in front of or this cave cavE all aI in ore Measurements of tho the just completed corn com cm- cm rl gives it a length lenth of feet teet of or ore bearing ground that has ha been developed d db by b feet reet In tn height and an nn average of five feet feel teel The Tho management proposes to continue its Hal development and blocked out tho the deposits In order that regular shipments shipments ship ship- ments ma may be started at at as early a date as f conditions will I permit Contracts forthe for the tho ore have been arranged ed so 50 that the company knows q Just what margin It I has |