Show To Deepen Shaft I At Greeley Creeley Mine Mill Indicated Ore Channel on Level Is Ob Objective Objective Ob- Ob With the completion of the gallows gal gal- lows frame over the shaft and the construction of the road t to the property work of sinking the tho shaft shafton on the tho Greeley Mining company property In the North Tintic section will be started Immediately It was announced Saturday at company of flees here The Thc objective of the work Is the foot level At this point a a. drift will be run to the north where where- a ore channel was waa indicated by the tho geophysical survey recently conducted by Carl W. W It was announced Sinking will be lie carried on front from the bottom of the thc present foot forty shaft In recommending the tho development development develop develop- ment campaign oi on the property h. h Ft M. M Crocker company engineer said A strong channel of sulphides was Indicated In Mr Chilson's surey survey sur sur- vey ey from the tho vicinity of the thc forty forty- Toot foot shaft northeasterly for about feet Ceet The top of this channel Is apparently about feet fact below the surface surface- of ot the ground and thirty feet north of the tho shaft Geological conditions aro very foj- foj largo large bodies of ore on this pron pron- erty All Iron sulphides in the vicinity havo been thoroughly oxidized arid It Is my belief that only a body of lead sulphide could have given the strong reverse dip readings read read- ings obtained by Mr Chion |