Show North Lily Appropriates F For or Completion of Su Surface face Plant Final appropriations amounting Uni to approximately 1000 have havo been made mado for the tho completion of the entire entire en- en tire tiro surface Plant of ot the North orth Lily property Of ot the International SmeltIng SmeltIng Smelting Smelt- Smelt Ing company located in the East t Tintie district it Jt was WAIl stated Friday Actual construction however Is I. contingent on the tho laying of a a. spur spurby spurby I by the tho railroad company at a point to conn connect t wi with th tho the proposed tramway tramway tram tram- way from the mine When completed providing the spur Is put In the surface plant of ot the North Lily Lib will represent an expenditure of ot approximately approximate The n new nV V equipment will In Include In elude clude a tramway costing about ore bins bin surface buildings building and complete equipment ot or th the triple le compartment shaft ahan At pr present pres ent tho COnt company ha has ha a R. hoist on the thO ground und which was wait purchased In the Tintic district t. t It I 1 anticipated ed that the tho work of ot Installing the ment and putting putUni the shaft in tn l will wilt require abou ety days dave Ia During this period Iod production tion lion will be in order to the Installation Installs give s1 attention to new tion work At the tho present time lime the triple compartment shaft of or the North Lily Is within twenty feet teet of connecting with tho the level cl Tho The I connection will made mado some ome time limo during the tho coming week |