| OCR Text |
Show Ni.llrs u tcmlrnrlors. Srnlml Ills for the erection of additions to tlie Tntitm.itiAi. in-sam; in-sam; asvi.oh ut Provo, Utah Territory, will lie received until noon, July 21, ISM. The work to be contracted for comprises excavation, nuwm-wurk, i-ar)nter-Hork, p!ai-ring, tinning, lire-proofing, wrought and castlron work and jointing. Teuders will be recclv.sl either for the entire n ork or for mamn-wnrk, rtre-iirooflug. cnrjuter-work (Including (In-cluding tinning, ainting ami roofing), and plastering, separately. separ-ately. Tlie cost of the entire work is estimated atalmut $110.00ti,ll. BidstolicarcnmiianiesI by ccrii-fied ccrii-fied checks of St ,000.00 for the entire en-tire job, aud $500.00 for each se-nite se-nite bid. The amount of check tile forfeited forfeit-ed In cae bidder sIhiuI J not lw willing will-ing to sign contrae-t one week after the latter Ins been awarded. Bidders Bid-ders are Invited lobe prceut at the opening of thu bids at the date above stntisl. Tholioard of Directors reserve the right to rejett any or all bids. B lids of one half the amount cf contract prion will lie itqulrt-d; the bondsmen to lie residents of the Territory of Utah and acceptable to the Board of Directors. Proposals to be filled out on blank form, obtainable at the office of It. Kietting, the architect or the building, build-ing, at Salt iAkeClty, in the Hooper Hoop-er .t Eldledge Block. Plans anil riiccificatlons will le ready for inpcction at the Asylum in Provo and at the office of tiie architect, in Salt Lake City, from : Wednesday, June 23, 1S9J. Byauthority of the Board of Directors. Di-rectors. W. N. DCSENEEKKY, Chairman of Building Committee. dlw |