OCR Text |
Show furnished for that purpose shall be signed and submitted by all bidders, in accordance with Executive Ex-ecutive Order No. 66-Ui, issued by the President on March 14, 1934. Only bids accompanied by such certificate shall be considered or accepted. The contractor to whom award is made shall require subcontractors sub-contractors and dealers furnishing furnish-ing equipment, materials, and supplies sup-plies to sign similar certificates before making awards to or purchases pur-chases from such sub-contractors or dealers, coppies of which will be furnished to the contracting officer. STATE ROAD COMMISSION, BY VV. J. PARKER, Chairman. K. C. WRIGHT, Chief Engineer. 9,000 sq. yds. Portland cement paving. The attention of bidders Is directed dir-ected to the Special Provisions covering subletting or assigning the contract and to the use of Domestic Materials. The minimum wage paid to all skilled labor employed on this contract shall be 90 cents per hour. The minimum wage paid to intermediate in-termediate labor employed on this contract shall be 05 cents per hour. The minimum wage paid to all unskilled labor employed on this contract shall be 55 cents per hour. Plans and specifications are on file in the office of the State Road' Commission, Salt Lake City, j where they may be reviewed by prospective bidders. Specifications, Specifica-tions, proposal, bidding blanks and plans will be furnished at Salt Lake City, on depositing $2.00, which will be returned, providing contractor submits an acceptable bid and returns the plans within seven days after bids are received. re-ceived. Any additional information may be secured at the office of the State Road Commission. Each bidder must submit a letter from an approved surety company guaranteeing guar-anteeing to furnish said bidder with required bond. The right to reject any or all bids is reserved Cash, certified check, or cashier's cash-ier's check for five per cent of ; total amount of bid made payable . to the State Road Commission must accompany each bid as evidence evi-dence of good faith and a guarantee guaran-tee that if awarded the contract the bidder will execute the contract con-tract and give bond as required. A certificate of compliance on the presecribed form which will be NOTICE TO CONTKACTOKS State of Utah Office of State Road Commission, Satl Lake City, Utah. December 14, 1934 Scaled bids will be received by the State Road Commission of Utah, State Capitol, Salt Lake City, Utah, at 10 o'clock a. m. Saturday, December 29th, 1934, and at that time publicly opened for construction of three grade separations and approaches at and near Springville in Utah county the same being U. S. Public Works j Projects No. N. R. M. 37-A & N. R. H. 37-B. The length of road to be constructed con-structed or improved is 1.176 miles, and the principal items of work are approximately as follows: fol-lows: timber piles, 16,200 lin. ft.; concrete, class "A", 1750 cu. yds.; reinforcing steel, 167,000 lbs.; structural steel, 110 tons; lumber, treated, 100 MFBM; unclassified excavation, .95,500 cu. yds. and |