OCR Text |
Show B.Y.U.TOHAVE NEW JJBRARY The Toung uniTersity will have a new library building at an approximate approxi-mate cost of 8125,000, according to a decision reached by the Latter-day Saint board of education at its last meeting. Plans and methods for the con-I con-I struction of the new building are now being considered by the church boar dof education, acording to Dr Franklin S. Harris, president of the Young university. The building will be constructed on University hill south of the sJiod building and east of the Maeoer Memorial building. It will be the center structure on the hill and will be erected near the point where the top of the hill is reached. According to Dr. Harris, the building build-ing will be a fire-proof modern library and will fill a long felt need at the church university. Students and alumni of the university uni-versity are jubilant over the announcement. an-nouncement. For years thev have urged the construction of such a building as one of the first steps necessary for the progress of the university. The decision of the board of education to construct the building indicates, according to friends of the institution, that other improvements will be made as the growth of the institution warrants. war-rants. It also indicates that the general policies of the university as outlined a few years ago by Dr. Harris will be gradually be carried out by the board of education. 1 |