| Show will be put in next season THE will soon be act bids an ardad by the ai iuni board ane engineering work for a power plant in canyon which has been under way for bome time past ts now completed and contrasts for tha con Bt ruction of the dam and ditch will be a mile and a half long from the dam to the power plan tare about to be let it ia not probable that much work will be dons the present season but work will ba pushed aa eoon as ti cable and it io the expectation that before another fall provo and ma will havea power plant from the waters of river the site of the power plant ia about six miles up provo canyon PA salt lake haa been in provo of late looking up the matter he is associated in tho enterprise with L L kunn of telluride it is their intention for the present to put in a 2000 horse power geue plant but the work will be constructed eo that the entire river can be drawn on for power and it is that the waters of the river will be powerful enough for a horse power plant |