Show OVER THE LINE mr bonns contract on the water works completed yesterday afternoon an reporter was asked to take a ride with mr jamea F duan who has a contract from rhodes bre for the on the north of the city this contract a chort distance die tance above gea akins place and extends to the place near smiths saw mill ahert the reservoir for water are the di stanca ia nearly four milea abbat fifty men have been at work sinca lh of october and it is expected that the work will be completed by there ars several deep cut layers of cement kava been penetrated and considering si the difficult digging the condrac tor baa completed the work in a vary abort time mr dunn has kept a boarding tent oa the ground for the convenience of his mea br fellow up mr dunna men with the bips pips cayere who build the wooden mains in the aa fast as the are duj th excavating on the reservoirs was finished lat night and it is expected that the entire system will be completed |