OCR Text |
Show WORK TO BE RUSHED. i Contract Is Let at Ogdin on South Fork Canyon Project. Special to The Tribune. OGDEN. Sept. 11. No time win bo lost In stripping n bedrock the city's dam-site dam-site in south Fork canyon preparatory to the building of the Immense dam and i reservoir by which Ogden city i water supply will be more than doubled and the farmers of Weber countj supplied With an abundant'- ,if water for irrigating irri-gating purposes during the dry months of summer. Acting under the directions of the cltj council, Cltj Engineer w. M. Bqstaph toda opened bid for the preliminary work. It was found that the J. P. O'Neill ''instruction COmpanj the lowest bidder. When the bids weie opened the mayor authorized the city engineer to olose up the contract with the O'Neill company and dirrt that the stripping of the darnel darn-el to begin at once, as the low sLifje of the -A.ilnr at lhq season of tho year makes it iiv most advantageous season for the work to he done |