Show utah central hallway alio utah central will have its grade completed to boss Sum irit in about a week the grade is completed now to woodland except in a few places where rock work is beins done wo learned tins that all bridges to be put in beyond park city v ere to be made for a standard anae track there is no doubt but that alie utah central will eventually be part of a transcontinental line tho work bein slone p tints to that cud on alie gumnit between park city and barclay Har clay snow sheds are beau erected anil the cuts widened A hurve vin party is at work running 1 line from barclay over alie summit it is said that in alie baring alie present heavy arade ivill be abandoned the buo ouo bein surveyed will not exceed three per cent in any place and will average lo 10 l o per cent A bi loop ani a tunnel will be alie means of a far better arade park miner |