Show New few Sewer Laterals Must Be Inspected An important announcement comes from Crom the sewer office this week Everyone building or planning to build a new home should be aware of the fact that the sewer line to the street must be inspected before it is covered up An inspection is necessary and if not inspected at th the time tim the time line is it it will have to be dug up lat later r and inspected inspected in in- before sewer facilities will be made available This is easily taken care of by a a call to the sewer to make an appointment A 25 deposit is is' also required which will vill be applied to the cost of oC the hop up fee Cee The cost of the time inspection is is' 5 The sewer district office also reports the plans' plans for the north treatment plant have been completed and mire are re now at the State Board of Health As soon as they Uley are approved by y the Board Board- of Health bids bids' will w 11 b be called for the construction of the plant It is hoped honed that the plant con str will begin by July 1 It is planned that the construction construction construe construe- tion lion of the sewer collection lines will be start started d late this sum summer me r and Ind will b be completed by the end of 1961 1 Ig 2 |