Show Connection Fees Set Sep By Sewer Server District Rules Hules governing charges for lor connections to lo the South Davis Sewer system were made this week by the board of or directors A ch charge rge of is set up for lor residential hook ups four Cour inch J line ne if paid in full lull before construction construction con conn passes the property If not paid in in full lull the fee is 30 The charge was set at for lor a six inch line and Coran for Cor foran foran an eight inch line if paid in full before construction construct on passes the the property They will be and respectively if not pa paid d I before construction passes the I property properly I IOn On existing homes the policy of the board of trustees is to lo install the appropriate size stub as listed above to the property line of every lot where a home or other building is now located ed whether or not the owner makes application for Cor sewer service service If no application Is signed and no connection fee Cee is paid by the owner before the construction construction construction con con- of oC the main line passes pas pas- ses his property the connection fee lee will automatically increase as indicated The owner will have 90 days after the date the district isable isable is isable able to receive sewage into its collection lines Jines to pay the connection connection connection con con- fee lee and complete the service lateral to the house After this date the owner will willbe willbe willbe be billed for lor the regular sewer sen service ice charge whether or not this connection is made The sewer service charge becomes a hen lien on the property if not paid and will then be certified to tho the count county for forr col col- lection with property properly taxes In any event it will be necessary necessary sary SalY for the connection fee to lo lobe tobe tobe be paid in full before the service service service ice lateral from the house can cnn be connected to the stub from the main line Owners of vacant lots may take advantage antage of the lower connection fee during the initial ini lial construction period if they will sign the application for sewer service and pay the connection connection con con- fee lee before belore the construction construction construction tion of the main line passes the property A stub will then be run to the properly property line for future connection to the house service lateral No sewer i f ice c e e charge will be made on such vacant property until such time as a building is started and a service lateral is connected to the stub from the main mam line |