Show North Salt lake Residents Approve Extra Bond Sale By IDA P. P LUBBERS The votes of a special bond election held June 2 in North Salt Lake were officially canvassed canvassed canvassed can can- at a recent meeting of the board of trustees The official count was as follows For the issue of waterworks waterworks waterworks water water- works b bonds 77 bonds 77 for 1 against For the issue of public Building bonds 67 for II Il against Pres Pies Ray C. C Hatch to the townspeople pIe for the favorable support given to the recommended financing fi financing fi- fi of the improvements The public building proposed will have facilities for board large recreation room fire station etc The waterworks bonds will supplement the issue issue issue is is- sue voted on December 5 1953 Demand for additional services not contemplated in the issue w was s responsible for the ilie additional additional ad ad- additional financing required however however however how how- ever the services being rendered render render- ed because of this additional enlargement enlargement enlargement en en- make the June 2 is issue issue is- is issue sue of bonds supported from revenues to be derived there there- from and will not require an increase increase increase in in- crease in taxation Bids were called for May 1 28 on the first phase of the waterworks waterworks waterworks water water- works construction in order to bring water service for industrial industrial industrial indus indus- trial use and fire protection to the General Motors ElectroMotive Electro Mo tive Division on South in North Salt Lake wl which ch is now under construction and also furnish furnish fur fur- furnish nish water to residents of North Salt Lake in that vicinity who have asked the board for water connections at the earliest possible possible possible pos pos- sible date because of the failure of their wells Seven contractors called for plans and specifications on the initial construction However only two completed bids were received and the contract was vas awarded to the lowest bidder J. J H. H Kingdon Plumbing and Heating Bountiful Mr King- King Ions idon's bid was less than the other bid received Due to the emergency need for water the contractor was required to commence construction immedi immedi- The balance of the waterworks waterworks waterworks water water- works construction will be posted posted posted post post- ed for bid in the very near future future fu fu- ture Mr Hatch stated and will include construction of a large reservoir installation of fire hydrants hydrants hy hy- hy- hy water mains service connections connections connections con con- etc Property owners in North Salt Lake who are arc interested in connecting connecting connecting con con- to the North Salt Lake water system should obtain application ap- ap ap ap- plic t on blanks from the clerk Freda B. B Wood and also pay the required connection fee which is for residential and for small commercial connect connect- prior to installation Pr President Pres Pres- s- s ident Hatch suggested that these applications and nd fees be deposited deposit deposit- ed prior to the installation of main lines in order that the ilie contractor contractor contractor con con- tractor may make installations of meters during that phase of construction construction con con- to av id delay delay- of servIceS servIceS' ices IceS IceS' |