Show I CrossCutting at Dngmar Crosscutting has begun on the prop crty of the Dagmar Mining company at Tintic sooner than had been planned by the management Conditions were so tempting at a depth of 350 feet In the shaft which continues dropping down however that It was decided to run out to the ledge on that level and to ascertain what changes had taken place The last ciosscut to it was at a depth of 200 feet There the ledge showed some rood ore and the management man-agement feels from indications In the shaft 350foot that level a body of ore awaits on the |