Show WORK AT FORT DOUGLAS Contracts Let to Local Firms for the Improvements to Boat Made Bo-at tho Post I Contracts for the beginning of the I work looking toward the remodeling oC Fort Douglas were let yesterday The contracts that have been signed up areas are-as follows The construction of the gymnasium proper was given to A J McDonald l38lG apparatus same firm 5M50 plumbing gas fitting and heating to P J Moran S273a electric wiring to T I C Allen Sl39 roads to J H Rees Co 5111110 sewage to Borne firm G300 walks to Utah Fire oofins company S37CO water system to Midgjey Co 1765 The contractors will begin work as coon as possible |