Show TRAM FOR THE DIXIE Construction to Begin i Without With-out Delay CONNECTS WITH RAILWAY Order for It Captured by Local House Win Span the Distance Between tho Companys Mines and Furnaces Out of St George The management of the Utah and I Eastern Mining company operating the Dixie mines and smelter out of St I George has decided to provide it with more economical means for the transportation trans-portation of ore between the mine and furnaces and to that end has directed Fred Richmond of the Salt Lake Hardware Hard-ware company to proceed at once with the construction of a gravity tramway to which the output will bo delivered over a railway the patient mule to provide the power for the latter The tramway said Mr Richmond will be no less l than 2200 feet In length while the railway will span a distance 01 one and onehalf miles the completion ol both to be accomplished as soon as possible Indeed the llrsl carload OL rail was forwarded yesterday and all material should be upon the grounJ by January I AVilh these facilities for the moving of the ore the expenso will be materially reduced while the annoyances an-noyances inseparable with teaming will have been entirely overcome |