Show BINS ABE ORDERED Further Arrangements for Active Moving of Ore at Boston Con The order for lumber with which to constiuct the ore bins at the properties of the 13o Lon Con Mining company Blngham was placed by Manage Johnson yesterday morning with worl upon them I to begin as soon as it can be delivered at the mouth of Armstrong tunnel from which the ores will Issue Is-sue The completion of the I bins will i not delay the active loading of ore 1m mediately the tracks of the Copper Eel railway have arrived however for that will not prevent the dumping of the copper gold mill aHverbcurlnt sul > hide upon the cars MS they atc belched from the tunnel Every samp ling of the slope at which active extraction under the contract with the Blngham Con smelter will begin show an average better than j per cent copper cop-per said the management during the day wlille the gold and silver value will compare with any that are coming out of camp with the iron excess I averaging 15 per cent Meantime the management of the Copper Bolt 1M I rushing I work on the gap between thc end of the track and the loading sta lion in a manner which Induces Mi Johnson to believe in Us completion by November 10th |