Show I Mammoths New Cable The new cable 2500 feet in length the longest in the Stnte and adapted to the requirements of the deepest shaft shae in the West Is now coiled around the big drum at the Mammoths hoiotcr and is handling the cage between the 1900 foot level and the surface Samuel Mcintyre Jr superintendent of the mill who came In yesterday says the earnings from that source during the month of September amounted to 25 000 and that the ores are maintaining an excellent graded The main shaft at the mine will not be continued to the 2000foot level until the winze on theO the-O chute has been put to that depth |