Show Bamberger R. R R. R Completes Local To ro passing passing- of longer longe trains from sidings on the Bamber Bamber- Bamberger ger railroad at Bountiful a new on one half mile side track has just been completed on Second Vest West street in the heart of the Julian Bam Barn Bamberger berger president of the company compan reported I I With heavier loads and longer trains caused by carrying vital supplies to Davis war plants the action was was wa's deemed necessary Mr I Bamberger said The track parallels I the thic pavement on the street for forI I many blocks and stop signs have been placed by Bountiful city on streets leading into Second West Vest which cross the tracks As a further safety measure it was pointed out that stop signs should be placed on street crossing II Second Vest West leading from the east which would also prove helpful in eliminating accidents as Second Vest West street is narrow Mr Bamberger announced that a huge hinge 1000 power horse-power diesel elec elec- electric electric motor for heavy freight haul haul- hauling hauling ing has been ordered and will ar ar- arrive arrive ar- ar rive nyc June 1 for use over the com corn company's compans pany's pans lines in Davis county A sec second second ond motor has also been ordered but delivery date on that was un un- uncertain unI un- un uncertain certain Mr Bamberger said I |