Show FARMINGTON CANYON SPILLWAY COMPLETED I Thursday March 0 from rom Co under the sup sup- f fat en isi n of D E E Davis foreman f at Co completed the rock 4 spill a Farmington at the mouths mouth of Farming Farming- ton Canyon canon oI The spill a spillway under con construction t for or a year ar and a f half but due to spring flood wa- wa waters 4 a year ear ago it was discontinued I ed cd until last fall all when work was 4 resumed by the e rolles after the they t returned from rom the terrace work I Con GO th mountains east Gf cf the 0 The rhe spillway is constructed of t stone and cement and is feet i long 40 feet wide 13 feet high and feet the thc has a drop of 25 oI 1 Tile The spillway will serve as at a curb to the flood floodwaters waters in a ef- ef efI I fort to protect farms arms and lagoon it will also serve as a stilling basin t for the water as it rushes down the t canon canyon of |