| Show CONTRACT LET it WM was rumored yesterday in that tho the contract tor ter the eare excavating avat ing for tho the darn dam ot of tho the pioneer electrio electric power caw er company P hail had been lot let to lo a company ot of t ahe to present sub contractor atre members member 16 holtier tho the contrael contract has yet been signed or note not work Is ij being don done oo on tho the excavation and fand the intention boeing to bo be to tho the excavation as boon on as hosli alc a on either side allo of the river bed la in all probability the ihu pipe line will LOP lap tale liver within tho tha next sixty days daya and when title w water s ter li turned down ills iho alpo the excavation will arill bo be finished across t ano a river bod bed it Is 13 also stated that tho the power corr company Pany lion purchased pui chadd tho the land tho the basin back ot of wheelers Who Wha elera elers bax cannon and liaa has forbidden all persons persona cutting timber limber on th atiat atland land what tho the intention 0 athe iho company fany la Is in regard to the inna inina is ii atalic known but lire basin 0 with lilt its it tine stream 0 of f water which can be ba greatly irre atly developed la 9 a valuable property prop tily eity for or pur docx lying as jt it does 01 on tho tha bank of tile tho creat reservoir mado made by tho he t dam it will III bo be doubly valuable tor for park purposes |