Show BOUNTifUL CITY AND TRUNK LINE COMPANY COMPLETE COMPROMISE Monday night at the annual meeting of Bountiful the of at the West Boun Boun- Boun- Boun Bountiful Mill 1111 Creek Irrigation company the lor final steps v were ere taken to effect the corn com compromIse promIse bet between een the several Irrigation companies and Bountiful City in regards to the city constructing a pipe line from the lower part of Mueller park to the upped end of the Union Trunk line to save have about 55 56 second feet of water vater which the tho city had filed on in n the tho state engineers office to save It from being lost through seepage An agreement had bad been reached with Ith all the other irrigation companies on I Mill Creek Under the ag cement the city Is iy to I toI perfect ct the filings on Mill Creek and turn over Its rights to the IrrigatIon companies concerned and construct and maintain the pipe line for the consider atlon 25 5 second feet continuous flow fIo of water The West est Bountiful Irrigation company made an additional demand namely in the event the saving laving gets to 25 5 ot or i a second foot toot then the city Is to share equally with tho the said Irrigation company The average loss by measurement over a period of three three years was as five fie fi e hundredths of a second fot tot |