Show SHIPMENT MADE after come little delay word was received that nine cora cars of ina machinery for tho the iron hsi hal been loaded at boiling springs PA on wed for to 10 0 ogdan don and all tile railway company to lo under contract to deliver the diac machinery binary in ogden wuhen I 1 fourteen days aft atter or it li is loaded the mt cli will douht doubtless less bo be it in ogden by about may th the delay was waa caused in tho the preparation for loading it requiring a I 1 longer 0 nger time than was at first anticipated |